Pingtung County Kanding refuse incinerator, turnkeyEnvironmental Protection Administration / 2000.08
Songshan Airport underpass Ø32″ steel pipe piles (12.7t)Continental Engineering / 2000.08
Ma’an Hydroelectric Plant 136,000kW M&E equipmentTaipower / 2000.03
Second Freeway bridge form travelers, fabrication and installation (contracts C342, C339)Nan Chuang Construction / Evergreen Heavy Industry / 1999.12
Okutataragi 388,000kW hydroelectric plant draft tube equipment, JapanMitsubishi Heavy Industries / 1996.08
China Steel Phase 4 plant piping, columns and tanks fabrication and installationChina Steel / 1996.01
Water main project (Ø200–Ø500)Taiwan Water Corporation / 1995.07
Ø800 steel pipe pilesFormosa Petrochemical / 1995.06
Ø800 steel pipe piles (Ø800X16t)Kinmen Jiugong Pier / 1995.05
Ø600 and Ø450 galvanized pipe piles for export to Japan (Ø800, Ø500)Pao Ling Enterprise / 1995.05
Wushantou Hydroelectric Plant fire protection and cooling pipingTatung / 1995.05
Underground water transmission pipelineTaiwan Water Corporation / 1995.03
Natural gas pipeline Ø24″X0.625X12MX52 (PE)CPC LNG Projects Department / 1995.03
China Steel Phase 4 expansion Ø800 steel pipe piles (Ø800X12t)China Steel / 1995.02
Wushantou Reservoir drainage pipeTaiwan Water Corporation / 1994.12
Sixth Naphtha Cracker Ø700 sand-dredging pipe (Ø700X16t)Formosa Plastics / 1994.12
Seawater pipe Ø2000mm and intake head lighthouseTaipower Tunghsiao Power Plant / 1994.09
Seawater intake/outfall pipes and intake head worksTaipower Tunghsiao Power Plant / 1994.08
Sixth Naphtha Cracker Ø700 sand-dredging pipeFormosa Plastics / 1994.06
Oil tank support columns Ø814mmX32t (22t)Taiwan Cement / 1994.05
Sixth Naphtha Cracker Ø700 sand-dredging pipe (Ø700mmX20tX12M)Formosa Plastics / 1994.05
Steel pipe piles Ø600mmX12tX17MKaohsiung Harbor Bureau / 1994.01
Type 120 towing carriage parts for the armed forcesCombined Logistics Command Arsenal 202 / 1993.11
Kaoping Hydroelectric Plant turbine worksTaipower Kaoping Power Plant / 1993.09
Bali Sewage Treatment PlantTaipei City Department of Environmental Protection / 1993.07
Natural gas pipeline (Ø24″x0.625)CPC Corporation / 1993.04
Sky Bow missile launch canistersCombined Logistics Command Arsenal 202 / 1993.01
Ø600mm steel pipe pilesTaipower Taichung Power Plant / 1993.01
Shuili Hydroelectric Plant 15,000kW M&E equipment, turnkeyTaipower Pumped Storage Construction Office / 1992.12
Antenna radar vehicle overhaul for the armed forcesNCSIST / 1992.08
Missile launcher assemblies and single/twin canister assembliesCombined Logistics Command Arsenal 202 / 1992.06
Missile transport vehicles for the armed forcesNCSIST / 1992.03
Subsea oil pipeline API 5L-X60 PE (Ø34″X0.5″X12M)CPC Kaohsiung Refinery / 1992.02
Slag breaker bar unitsChina Steel / 1992.01
Fifth Naphtha Cracker pipe supportsCPC Corporation / 1991.12
Heat exchanger tube bundle fabricationCPC Refining & Manufacturing Research Institute / 1991.09
Subsea oil pipeline API 5L-X60 (PE) 16″X0.75″CPC Corporation / 1991.06
Heat exchanger tube bundle reshapingCPC Chiayi Solvent Plant / 1991.06
T76 towed gun carriage assemblies / ammunition box assembliesCombined Logistics Command Arsenal 202 / 1991.05
Subsea oil pipeline API 5L-X60 (PE) 56″X0.75″CPC Corporation / 1991.04
2,000KL spherical tank, turnkeyCPC Corporation / 1991.04
Domestically built Sky Bow missile launch canistersNCSIST / 1991.01